Sunday, June 14, 2015

Day 23: We have a House!

Day 23:  We have walls, floors, and a roof!

Front of House


Right side of Garage

Left side of Garage

View from the Study

Back of Study (looking out back of house)
View from Front Room (looking out back of house)

View from Kitchen (looking out back of house)
Front Room

View from Front Room (looking out front of house)
Hallway to Great Room and Basement Stairs
Great Room (view from Front Room)


Fireplace in Great Room

View from Great Room (Kitchen)


Second Floor - Bedroom 1

Second Floor Hallway

Second Floor: Bedroom 2

Second Floor: Bedroom 3

Second Floor: Laundry Room

Second Floor: Hall Bath

Second Floor: Bedroom 3

Second Floor: Bedroom 3 Closet


Second Floor: Master Bedroom Closets
  
Second Floor: Master Bedroom

Second Floor: Master Bath - Water Closet


Second Floor: Master Bath - Sink 1


Second Floor: Master Bath










Porch
Porch

Monday, June 8, 2015

Day 17: Framing has Started!

The lumber was delivered and the framing has started!  They also paved our road, which was nice.  We had a minor concern that the garage service door was put in the wrong place (we had requested that it be placed near the rear of the garage), but after talking to our project manager, all is well.  We learned that the garage wall had come pre-fabricated with the door near the front.  They'll re-do the supports where the door opening is and frame in a door at the rear.

Pictures Start on the Front Porch and go around the house counter-clockwise:












"In the Basement":











Day 9: Foundation Waterproofed and Backfilled

Not as much got done as we had hoped, but the foundation has been waterproofed and backfilled.  Just waiting for our lumber to be delivered and then framing will start!